Agenda item 22 / After the meeting

WS-26-0479-SVIC LAND, LLC: WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) eliminate electric vehicle (EV) charging; and 2) reduce driveway…

Clark County Zoning Commission · October 21, 2026 · 9:00 AM Pacific

Approved

From the official record

What the record shows.

Item 22 of 66

The county’s record shows this item was approved.

No roll call is in the record for this item. A missing vote is never read as unanimous.

Note in the minutes
APPROVED. CONDITIONS OF APPROVAL - Comprehensive Planning · Certificate of Occupancy and/or business license shall not be issued without approval of a Certificate of Compliance. · Applicant is advised within 2 years from the approval date the application must commence or the application will expire unless extended with approval of an extension of time; a substantial change in circumstances or regulations may warrant denial or added conditions to an extension of time; the extension of time may be denied if the project has not commenced or there has been no substantial work towards completion within the time specified; changes to the approved project will require a new land use application; and the applicant is solely responsible for ensuring compliance with all conditions and deadlines. Public Works - Development Review · Drainage study and compliance; · Traffic study and compliance; · Full off-site improvements; · Right-of-way dedication for Las Vegas Boulevard South per RS-25-500155; · Applicant to execute and sign a License and Maintenance Agreement for any non-standard improvements within the right-of-way; · Loading docks shall not be placed opposite or adjacent to any driveway as determined by Public Works - Development Review; · Applicant to coordinate with Public Works for any traffic related improvements. Department of Aviation · Applicant is required to file a valid FAA Form 7460-1, "Notice of Proposed Construction or Alteration" with the FAA, in accordance with 14 CFR Part 77, or submit to the Director of Aviation a "Property Owner's Shielding Determination Statement" and request written concurrence from the Department of Aviation; · If applicant does not obtain written concurrence to a "Property Owner's Shielding Determination Statement," then applicant must also receive either a Permit from the Director of Aviation or a Variance from the Airport Hazard Areas Board of Adjustment (AHABA) prior to construction as required by Section 30.02.26B of the Clark County Unified Development Code. Applicant is advised that many factors may be considered before the issuance of a permit or variance, including, but not limited to, lighting, glare, graphics, etc.; · No building permits should be issued until applicant provides evidence that a "Determination of No Hazard to Air Navigation" has been issued by the FAA or a "Property Owner's Shielding Determination Statement" has been issued by the Department of Aviation. The Determination of No Hazard must not be expired. · Applicant is advised that the FAA's determination is advisory in nature and does not guarantee that a Director's Permit or an AHABA Variance will be approved; that FAA's airspace determinations (the outcome of filing the FAA Form 7460-1) are dependent on petitions by any interested party and the height that will not present a hazard as determined by the FAA may change based on these comments; and that the FAA's airspace determinations include expiration dates and that separate airspace determinations will be needed for construction cranes or other temporary equipment; and that the Department of Aviation wishes to coordinate on roadway planning, specifically on the Las Vegas Boulevard corridor and Jean/Interstate-15 interchange, to facilitate future transportation options for the Southern Nevada Supplemental Airport which is currently in the planning phase.
On the agenda, in the county’s wording
WS-26-0479-SVIC LAND, LLC: WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) eliminate electric vehicle (EV) charging; and 2) reduce driveway throat depth. DESIGN REVIEW for a proposed office/warehouse facility on 59.2 acres in an IP (Industrial Park) Zone. Generally located east of Interstate 15 and north of Prison Road within Jean. MN/sd/cv (For possible action)
File number
26-0479-102126

Documents on file with this item

Each link opens the county’s own copy.

A recorded action applies to the motion or item described. Missing vote details are not treated as a unanimous vote. Later corrections or official minutes may add context.