From the official record
What the record shows.
Item 62 of 66
The county’s record shows this item was approved.
No roll call is in the record for this item. A missing vote is never read as unanimous.
- Note in the minutes
- APPROVED. USE PERMIT #1 AND WAIVER OF DEVELOPMENT STANDARDS #2 WERE WITHDRAWN. CONDITIONS OF APPROVAL - Comprehensive Planning · Certificate of Occupancy and/or business license shall not be issued without approval of a Certificate of Compliance, and payment of the tree fee-in-lieu is required for any required trees waived. · Applicant is advised within 4 years from the approval date the application must commence or the application will expire unless extended with approval of an extension of time; a substantial change in circumstances or regulations may warrant denial or added conditions to an extension of time; the extension of time may be denied if the project has not commenced or there has been no substantial work towards completion within the time specified; changes to the approved project will require a new land use application; and the applicant is solely responsible for ensuring compliance with all conditions and deadlines. Public Works - Development Review · Drainage study and compliance; · Traffic study and compliance; · Full off-site improvements; · If required by the Regional Transportation Commission (RTC), applicant shall dedicate and construct a combination right-turn lane and bus turn-out on Nellis Boulevard with a 5 foot by 25 foot concrete shelter pad behind sidewalk for bus stop shelter in accordance with RTC standards; · The installation of detached sidewalks will require the vacation of excess right-of-way and granting necessary easements for utilities, pedestrian access, streetlights, and traffic control devices; · Applicant is advised that Nevada Department of Transportation (NDOT) permits may be required. Fire Prevention Bureau · Ensure that the fire access lanes, turning radius, turn arounds, stub streets and hydrant placements all meet the Clark County code requirements. · Applicant is advised that permits may be required for this facility and to contact Fire Prevention for further information at (702) 455-7316. Clark County Water Reclamation District (CCWRD) · Applicant is advised that a Point of Connection (POC) request has been completed for this project; to email [email protected] and reference POC Tracking #0115-2027 to obtain your POC exhibit; and that flow contributions exceeding CCWRD estimates may require another POC analysis.
- On the agenda, in the county’s wording
- UC-26-0562-LAMB INDUSTRIAL CONDOS LLC & NELLIS HARRIS REVERSE, LLC: USE PERMITS for the following: 1) vehicle wash; and 2) vehicle maintenance and repair. WAIVERS OF DEVELOPMENT STANDARDS for the following: 1) reduce street landscaping; 2) increase maximum parking; 3) modify residential adjacency standards; and 4) reduce throat depth. DESIGN REVIEW for a proposed commercial complex on 3.50 acres in a CG (Commercial General) Zone. Generally located on the east side of Nellis Boulevard and north side of Harris Avenue within Sunrise Manor. TS/jud/cv (For possible action)
- File number
- 26-0562-102126
Documents on file with this item
Each link opens the county’s own copy.
A recorded action applies to the motion or item described. Missing vote details are not treated as a unanimous vote. Later corrections or official minutes may add context.