Agenda item 7 / After the meeting

ET-26-400095 (UC-23-0424)-USA: USE PERMITS SECOND EXTENSION OF TIME for the following: 1) electric generating station (solar photovoltaic facility);…

Clark County Zoning Commission · November 18, 2026 · 9:00 AM Pacific

Approved

From the official record

What the record shows.

Item 7 of 57

The county’s record shows this item was approved.

No roll call is in the record for this item. A missing vote is never read as unanimous.

Note in the minutes
APPROVED. CONDITIONS OF APPROVAL - Comprehensive Planning · Until October 18, 2028 to commence or the application will expire unless extended with approval of an extension of time. · Applicant is advised a substantial change in circumstances or regulations may warrant denial or added conditions to an extension of time; the extension of time may be denied if the project has not commenced or there has been no substantial work towards completion within the time specified; and the applicant is solely responsible for ensuring compliance with all conditions and deadlines. Public Works - Development Review · Comply with previous conditions.
On the agenda, in the county’s wording
ET-26-400095 (UC-23-0424)-USA: USE PERMITS SECOND EXTENSION OF TIME for the following: 1) electric generating station (solar photovoltaic facility); 2) electric substation; 3) overhead power transmission line; 4) increase the height of utility structures; 5) public utility structures with all accessory structures; 6) waive landscaping and screening requirements; 7) eliminate trash enclosure; 8) waive noise standards; and 9) allow signage in conjunction with the electric generating station and electrical substation. WAIVER OF DEVELOPMENT STANDARDS for full off-site improvements. DESIGN REVIEWS for the following: 1) electric generating station (solar photovoltaic facility) 2) electrical substation; 3) overhead power transmission line; 4) maintenance and operations building; 5) public utility structures with all accessory/ancillary structures and uses; 6) final grading for a hillside development (slopes greater than 12%); and 7) finished grade on a 4,457.00 acre portion of a 9,487.70 acre site in an RS80 (Residential Single-Family 80) Zone. Generally located southwest of SR 160 and north of Tecopa Springs Road (alignment) within the Northwest County Planning Area. JJ/tpd/cv (For possible action)
File number
26-400095-111826

Documents on file with this item

Each link opens the county’s own copy.

The plain-English brief · Free with a sign-in

Zoning changes, new housing, and land-use rules before Clark County

The brief for this meeting has a plain-language line for this item, beside fuller explanations of its main items. Machine-checked against the official record; not reviewed by a person.

Free. No password. One email with a link that brings you back to this page. Signing in does not turn on brief emails. Privacy.

A recorded action applies to the motion or item described. Missing vote details are not treated as a unanimous vote. Later corrections or official minutes may add context.