From the official record
What the record shows.
Item 38 of 57
The county’s record shows this item was approved.
The recorded roll call was 7–0.
- Note in the minutes
- APPROVED. CONDITIONS OF APPROVAL - Comprehensive Planning · Conduct a parking study after construction of the building. If the study indicates insufficient parking, applicant to provide a parking plan to meet the needs of the shopping center; · 6 months from certificate of occupancy of new building to review parking study. · Applicant is advised within 2 years from the approval date the application must commence or the application will expire unless extended with approval of an extension of time; a substantial change in circumstances or regulations may warrant denial or added conditions to an extension of time; the extension of time may be denied if the project has not commenced or there has been no substantial work towards completion within the time specified; changes to the approved project will require a new land use application; and the applicant is solely responsible for ensuring compliance with all conditions and deadlines. Public Works - Development Review · Applicant shall agree to participate in a Special Improvement District (SID) for off-site improvements, including, but not limited to, paving, curb and gutter, streetlights, and fire hydrants; · Drainage study and compliance; · Traffic study and compliance; · 30 days to coordinate with Public Works - Design Division and submit separate document if required, for dedication of any necessary right-of-way and easements for the Spring Mountain improvement project. · Said dedication must occur prior to issuance of building permits, concurrent with the recording of a subdivision map, OR within 30 calendar days from a request for dedication by the County. Clark County Water Reclamation District (CCWRD) · Applicant is advised that a Point of Connection (POC) request has been completed for this project; to email [email protected] and reference POC Tracking #0100-2026 to obtain your POC exhibit; and that flow contributions exceeding CCWRD estimates may require another POC analysis.
- Action field in official record
- It was moved that the recommendation be Approved. On roll call, motion carried by the following vote:
- On the agenda, in the county’s wording
- WS-26-0644-US HUI DE REAL ESTATE INVESTMENT CORP.: WAIVER OF DEVELOPMENT STANDARDS for alternative driveway geometrics. DESIGN REVIEW for a proposed commercial building in conjunction with an existing shopping center on 3.14 acres in a CG (Commercial General) Zone. Generally located north of Spring Mountain Road and east of Arville Street within Paradise. JJ/dd/cv (For possible action)
- File number
- 26-0644-111826
Recorded roll call · 7–0
This roll call applies to the recorded motion, which may concern an amendment or deferral rather than the original proposal.
- Michael Naft — Voting Aye
- William McCurdy II — Voting Aye
- April Becker — Voting Aye
- Jim Gibson — Voting Aye
- Justin Jones — Voting Aye
- Marilyn K. Kirkpatrick — Voting Aye
- Tick Segerblom — Voting Aye
Documents on file with this item
Each link opens the county’s own copy.
The plain-English brief · Free with a sign-in
Zoning changes, new housing, and land-use rules before Clark County
The brief for this meeting has a plain-language line for this item, beside fuller explanations of its main items. Machine-checked against the official record; not reviewed by a person.
Check your inbox.
We sent a sign-in link to . Open it in this browser within 20 minutes and you will come straight back to this item.
Free. No password. One email with a link that brings you back to this page. Signing in does not turn on brief emails. Privacy.
A recorded action applies to the motion or item described. Missing vote details are not treated as a unanimous vote. Later corrections or official minutes may add context.