Agenda item 52 / After the meeting

TM-26-500137-COUNTY OF CLARK (AVIATION): TENTATIVE MAP consisting of 1 commercial lot on 3.64 acres in a CG (Commercial General) Zone with the…

Clark County Zoning Commission · November 18, 2026 · 9:00 AM Pacific

Approved

From the official record

What the record shows.

Item 52 of 57

The county’s record shows this item was approved.

No roll call is in the record for this item. A missing vote is never read as unanimous.

Note in the minutes
APPROVED. CONDITIONS OF APPROVAL - Comprehensive Planning · Applicant is advised within 4 years from the approval date a final map for all, or a portion, of the property included in this application must be recorded or it will expire; an application for an extension of time may only be submitted if a portion of the property included under this application has been recorded; a substantial change in circumstances or regulations may warrant denial or added conditions to an extension of time; the extension of time may be denied if there has been no substantial work towards completion; and the applicant is solely responsible for ensuring compliance with all conditions and deadlines. Public Works - Development Review · Drainage study and compliance; · Traffic study and compliance; · Full off-site improvements; · Right-of-way dedication to include the associated spandrel at the intersection of Gary Avenue and Ullom Drive; · 30 days to coordinate with Public Works - Design Division and submit separate document if required, for dedication of any necessary right-of-way and easements for the Decatur Boulevard improvement project; · Said dedication must occur prior to issuance of building permits, concurrent with the recording of a subdivision map, OR within 30 calendar days from a request for dedication by the County; · The installation of detached sidewalks will require dedication to back of curb and granting necessary easements for utilities, pedestrian access, streetlights, and traffic control devices. Building Department - Addressing · Street suffixes shall be spelled out. Clark County Water Reclamation District (CCWRD) · Applicant is advised that a Point of Connection (POC) request has been completed for this project; to email [email protected] and reference POC Tracking #0571-2026 to obtain your POC exhibit; and that flow contributions exceeding CCWRD estimates may require another POC analysis.
On the agenda, in the county’s wording
TM-26-500137-COUNTY OF CLARK (AVIATION): TENTATIVE MAP consisting of 1 commercial lot on 3.64 acres in a CG (Commercial General) Zone with the Airport Environs (AE-60) Overlay. Generally located east of Decatur Boulevard and south of Gary Avenue within Enterprise. JJ/sd/cv (For possible action)
File number
26-500137-111826

Documents on file with this item

Each link opens the county’s own copy.

The plain-English brief · Free with a sign-in

Zoning changes, new housing, and land-use rules before Clark County

The brief for this meeting has a plain-language line for this item, beside fuller explanations of its main items. Machine-checked against the official record; not reviewed by a person.

Free. No password. One email with a link that brings you back to this page. Signing in does not turn on brief emails. Privacy.

A recorded action applies to the motion or item described. Missing vote details are not treated as a unanimous vote. Later corrections or official minutes may add context.